Line drawing of south elevation of Peyton Randolph House roof
Kitchen Covered Way Frame Raising
The west wall is raised into place.
Wooden pegs secure the mortice and tenon joints.
Pegging the door frame.
The east wall goes up, and the ceiling joists are installed across the span.